SMP A NNNL01.TXT
General Purpose gINT v. 7 Reports:
Report Type: Site Map (gINT Professional License required; this will not run with gINT Logs or logs+)
Page Size: A (8.5x11")
Applicability: Can be used for Geotechnical or Environmental reporting
Well: N/A
Graph: N/A
Legend: Yes
English (Imperial) units
Portrait Orientation
**************************************
Revision History:
20 February 2006:
1. Improved consistency of naming.
2. Exploded drawing library blocks and removed them from shipping library.
30 September 2005:
Initial Upload
*************************************************
INCLUDED FILES:
SMP A NNNL 01.GLB
gINT library file containing:
Site Map : SMP A NNNL01
Data Marker : SMP A NNNL01 CPT
SMP A NNNL01 MONITOR WELL
SMP A NNNL01 SOIL BORING
SMP A NNNL01 TEST PIT
SMP A NNNL01 TEST WELL
SMP A NNNL 01.GPJ
gINT project file containing multiple boreholes. You can use this file to clarify any input procedure questions by looking at the way the data was entered in the Input application. You can also output this data using the report template to see what the final output looks like.
*************************************************
INSTALLATION PROCEDURE:
Copy SMP A NNNL01.GPJ to your gINT projects directory (usually C:\Program Files\GINT\PROJECTS or C:\Program Files\GINTW\PROJECTS).
Merge SMP A NNNL01.GLB:
Bring up gINT.
Move to the Utilities application group and then to the Lib Merge/Copy application.
Mark "Merge From".
Specify the source library file as SMP A NNNL01.GLB. Remember to specify the path or use the launch button (...) to select
the file with a file dialog.
Check the selection non duplicated and always query options.
Move Data Markers, Drawing Library, Pointid marker expressions and sitemap reports from the Available Source Table column to the Tables to Merge/Copy column by clicking the >> button.
Click the Execute button.
Move all of the available items in each catagory to merge into your current library.
*************************************************
SPECIAL NOTES:
1. No data template is provided. For your project structure to work, you need North and East coordinates on each borehole and a site map.
2. The field references for the data in the header may need to be changed for your database structure.
3. The company information is taken from the Help:Company Information dialog.
4. Search for "Site Map" in Help for details of working with site maps.
*************************************************