MI_DOT.TXT
gINT v. 5 Agency Form:
Michigan Department of Transportation Log
English or Metric Units Input
English or Metric Units Output
REVISION HISTORY
================
14 December 2003:
Converted to version 5 format.
09 May 2001:
Initial Upload
*************************************************
INCLUDED FILES:
MI_DOT.GLB
gINT library file containing:
Logs : MI DOT
Discrete Graphics: MI DOT (logo)
MIDOT BLOW COUNT ELLIPSE
Lookup Lists : MIDOT UNITS
User System Data : MIDOT_Blows_Extent
MIDOT_Depth_Log_Page
MIDOT_Depth_To_Elev
MIDOT_Ft_M_Conversion
MIDOT_Ft_M_Factor
MIDOT_Ft_M_Label
MIDOT_In_Cm_Label
MIDOT_Input_Not_Eq_Output
MIDOT_Input_Units
MIDOT_Log_Reference_Elev
MIDOT_Log_Vertical_Scale
MIDOT_Max_Elev
MIDOT_Min_Elev
MIDOT_Offset_Conversion
MIDOT_Output_Units
MIDOT_Sample_Data_Depth
MIDOT_Station_Conversion
MI_DOT.GDT
gINT project data template. You will clone this file to create new project files.
MI_DOT.GPJ
gINT project file containing six boreholes of example data. You can use this file to clarify any input procedure questions by looking at the way the data was entered in the Input application. You can also output this data using the report template to see what the final output looks like.
*************************************************
INSTALLATION PROCEDURE:
Copy MI_DOT.GDT to your gINT data template directory (usually C:\GINTW\DATATMPL or
C:\Program Files\GINTW\DATATMPL).
Copy MI_DOT.GPJ to your gINT projects directory (usually C:\GINTW\PROJECTS or
C:\Program Files\GINTW\PROJECTS).
Merge MI_DOT.GLB
Bring up gINT.
Move to the Utilities application group and then to the Lib Merge/Copy application.
Mark "Merge From".
Specify the source library file as MI_DOT.GLB. Remember to specify the path or use
the launch button (...) to select the file with a file dialog.
Check the selection and query options to best meet your needs. If you wish to merge
all of the above, mark Select All and Never Query.
Move all of the tables from the Available Source Table column to the Tables to
Merge/Copy column by clicking the >> button.
Click the Execute button.
*************************************************
SPECIAL NOTES:
1. The form prints six boreholes per page and it determines the scale based on the maximum surface elevation for all boreholes minus the minimum bottom elevation for all holes. You can override the scale for all boreholes using the Override Log Scale in the PROJECT table and for specific boreholes using the Override Log Scale in the BOREHOLE (POINT) table.
*************************************************