FNC AB NNNN02.TXT

General Purpose gINT version 5 Fence Reports:
  US A size paper (letter - 216 x 279 mm)
  US B size paper (tabloid - 279 x 432 mm)
  Page units in millimeters

  General Purpose report (only has lithology graphics columns)
  No well column
  No graph
  No Legend

  Landscape Orientation
  Metric input and output

================
REVISION HISTORY
================

12 November 2002:
  Initial Upload
*************************************************

INCLUDED FILES:
FNC AB NNNN02.GLB
  gINT library file containing:
    Fences:        FNC AB NNNN02 - A Size
                 FNC AB NNNN02 - B Size


FNC AB NNNN02.GDT
  gINT project data template.  You will clone this file to create new project files.

FNC AB NNNN02.GPJ
  gINT project file containing example data.  You can use this file to clarify any input procedure questions by looking at the way the data was entered in the Input application.  You can also output this data using the report template to see what the final output looks like.
*************************************************

INSTALLATION PROCEDURE:
  Copy FNC AB NNNN02.GDT to your gINT data template directory (usually C:\PROGRAM FILES\GINTW\DATATMPL or C:\PROGRAM FILES\GINT\DATATMPL).
  Copy FNC AB NNNN02.GPJ to your gINT projects directory (usually C:\PROGRAM FILES\GINTW\PROJECTS or C:\PROGRAM FILES\GINT\PROJECTS).
  Copy FNC AB NNNN02.GLB to your gINT temp directory (usually C:\PROGRAM FILES\GINTW\TEMP or C:\PROGRAM FILES\GINT\TEMP).
  Merge FNC AB NNNN02.GLB:
    Bring up gINT.
    Move to the Utilities application group and then to the Lib Merge/Copy application.
    Mark "Merge From".
    Specify the source library file as FNC AB NNNN02.GLB.  Remember to specify the path or use the launch button (...) to select the file with a file dialog.
    Mark Select All and Never Query.  There is only one record to merge.
    Move FENCE REPORTS from the Available Source Table column to the Tables to Merge/Copy column by clicking the >> button.
    Click the Execute button.
*************************************************

SPECIAL NOTES:
1.  You need to remove the "Logo" text at the lower left and its surrounding rectangle.  You can then specify your company logo in its place (Draw:Discrete Graphics or Draw:Bitmap Symbol).

2.  The company information in the lower left is taken from the Company Information dialog (Help:Company Information).

3.  Check that the project field references at the lower right match your database fields.
*************************************************