FNC 43 NNNN01.TXT
General Purpose gINT version 5 Fence Reports:
A4 size paper (210 x 297 mm)
A3 size paper (297 x 420 mm)
Page units in millimeters
General Purpose report (only has lithology graphics columns)
No well column
No graph
No Legend
Landscape Orientation
Metric input and output
================
REVISION HISTORY
================
26 December 2002:
Initial Upload
*************************************************
INCLUDED FILES:
FNC 43 NNNN01.GLB
gINT library file containing:
Fences: FNC 43 NNNN01 - A4 Size
FNC 43 NNNN01 - A3 Size
FNC 43 NNNN01.GDT
gINT project data template. You will clone this file to create new project files.
FNC 43 NNNN01.GPJ
gINT project file containing example data. You can use this file to clarify any input procedure questions by looking at the way the data was entered in the Input application. You can also output this data using the report template to see what the final output looks like.
*************************************************
INSTALLATION PROCEDURE:
Copy FNC 43 NNNN01.GDT to your gINT data template directory (usually C:\PROGRAM FILES\GINTW\DATATMPL or C:\PROGRAM FILES\GINT\DATATMPL).
Copy FNC 43 NNNN01.GPJ to your gINT projects directory (usually C:\PROGRAM FILES\GINTW\PROJECTS or C:\PROGRAM FILES\GINT\PROJECTS).
Copy FNC 43 NNNN01.GLB to your gINT temp directory (usually C:\PROGRAM FILES\GINTW\TEMP or C:\PROGRAM FILES\GINT\TEMP).
Merge FNC 43 NNNN01.GLB:
Bring up gINT.
Move to the Utilities application group and then to the Lib Merge/Copy application.
Mark "Merge From".
Specify the source library file as FNC 43 NNNN01.GLB. Remember to specify the path or use the launch button (...) to select the file with a file dialog.
Mark Select All and Never Query. There is only one record to merge.
Move FENCE REPORTS from the Available Source Table column to the Tables to Merge/Copy column by clicking the >> button.
Click the Execute button.
*************************************************
SPECIAL NOTES:
1. You need to remove the "Logo" text at the lower left and its surrounding rectangle. You can then specify your company logo in its place (Draw:Discrete Graphics or Draw:Bitmap Symbol).
2. The company information in the lower left is taken from the Company Information dialog (Help:Company Information).
3. Check that the project field references at the lower right match your database fields.
*************************************************